Optimal Day-Ahead Bidding in the MIBEL's Multimarket Energy Production System

Publication TypeConference Paper
Year of Publication2010
AuthorsCristina Corchero; F.-Javier Heredia
Conference Name7th Conference on European Energy Market EEM10
Conference Date23-25/06/2010
Conference LocationMadrid, Spain
Type of WorkContributed Presentation
Key Wordsresearch; multimarket; bilateral contracts; futures contracts; optimal bid; stochastic programming; MIBEL
AbstractAbstract—A Generation Company (GenCo) can participate in the Iberian Electricity Market (MIBEL) through different mechanisms and pools: the bilateral contracts, the physical derivatives products at the Derivatives Market, the bids to the Day-Ahead Market, the Intraday Markets or the Ancillary Services Markets. From the short-term generation planning point of view, the most important problem to solve is the bidding strategy for the Day-Ahead Market (DAM) given that the 85% of the physical energy traded in Spain is negotiated in it, but this participation cannot be tackled independently of other subsequent markets.
URLClick Here
ExportTagged XML BibTex
AttachmentSize
EEM10_gnom.pdf482.27 KB
EEM10 Atten Cert.pdf118.47 KB